Once
council has approved your proposed pool, we meet you on site to mark out the
pool and finalise your desired shape.
Excavation
of your pool can now take place.
With
the excavation now complete, the erection of formwork and the placement of the
reinforcing steel is carried out. During this stage the pre-plumbing of the
pool occurs.
Concrete
is then pneumatically sprayed, encasing the steel work to minimum thickness
of 150mm.
It is then trowelled and styled to the desired shape.
After
the concrete shell has cured, your chosen surface finishes (coping & waterline
tiles) are then applied.
During
this stage your filtration and any related equipment is installed.
After
approval of your pool fencing by council, the pool is cleaned out and the interior
surface is applied. The following day the pool is filled with water.
Blow
up your floaties!!!